E HARDY RD NB over S APPR TO ALDINE MAIL RT

0.02 MI S OF ALDINE MAIL · County 201, Texas · Built 1987 · 2 Lanes · 11,065 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
121020AA5775043
Year Built
1987
Reconstructed
2013
Length
63.4 m (208 ft)
Max Span
27.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
11,065
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.