STEEPLEWAY BLVD SB over S WHITEOAK BAYOU

0.25 MI NE OF US 290 · County 201, Texas · Built 1983 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
121020AA7754002
Year Built
1983
Length
27.7 m (90.9 ft)
Max Span
9.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.