STEEPLEWAY BLVD NB over S WHITEOAK BAYOU
0.25 MI NE OF US 290 · County 201, Texas · Built 1983 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
29.898836, -95.588628
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 43 years old.
Nearby Bridges
STEEPLEWAY BLVD SB over S WHITEOAK BAYOU
Built 1983
JONES RD SB over S WHITE OAK BAYOU
Built 1975
JONES RD NB over S WHITE OAK BAYOU
Built 1975
CASTLEBRIDGE DRIVE over DRAINAGE DITCH
Built 2004
US 290 AVL over US 290 WB
Built 1989
US 290 WB FR over HCFCD E-135-00-00
Built 2018
US 290 WB ML over HCFCD UNIT E135-00-00
Built 1989
US 290 EB ML over HCFCD UNIT E135-00-00
Built 1985
US 290 AVL RP over US 290 WB FR AT WEST RD
Built 2018
US 290 EBFR over HCFCD DRAINAGE DITCH
Built 2014
Bridge Details
- Structure #
- 121020AA7754001
- Year Built
- 1983
- Length
- 27.7 m (90.9 ft)
- Max Span
- 9.1 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.