NEEDLEPOINT RD over MCGEE GULLY
.25MI E OF SJOLANDER RD · County 201, Texas · Built 1992 · 2 Lanes · 252 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.810975, -94.933811
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 34 years old.
Nearby Bridges
IH 10 over MCGEE GULLY
Built 1960
IH 10 over SJOLANDER RD
Built 2001
SJOLANDER RD over MCGEE GULLY
Built 1989
IH 10 over UP RR
Built 2001
IH 10 EB FR over CEDAR BAYOU
Built 1999
IH 10 ML over CEDAR BAYOU
Built 1999
IH 10 WB FR over CEDAR BAYOU
Built 1999
IH 10 over NORTH MAIN ST
Built 2001
SJOLANDER RD over CARY BAYOU
Built 1970
SH 146 over HORSEPEN BAYOU
Built 1943
Bridge Details
- Structure #
- 121020AA3362001
- Year Built
- 1992
- Length
- 12.8 m (42 ft)
- Max Span
- 12.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 252
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.