IH 10 over SJOLANDER RD
7.75 MI E OF SAN JAC RIV · County 201, Texas · Built 2001 · 6 Lanes · 72,500 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.81255, -94.938586
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 25 years old.
Nearby Bridges
SJOLANDER RD over MCGEE GULLY
Built 1989
IH 10 over MCGEE GULLY
Built 1960
NEEDLEPOINT RD over MCGEE GULLY
Built 1992
IH 10 over UP RR
Built 2001
IH 10 over NORTH MAIN ST
Built 2001
IH 10 EB FR over CEDAR BAYOU
Built 1999
IH 10 ML over CEDAR BAYOU
Built 1999
IH 10 WB FR over CEDAR BAYOU
Built 1999
SJOLANDER RD over CARY BAYOU
Built 1970
HADDEN RD over HCFCD DITCH
Built 1989
Bridge Details
- Structure #
- 121020050801331
- Year Built
- 2001
- Length
- 98.1 m (321.9 ft)
- Max Span
- 36 m
- Width
- 35.1 m (115.2 ft)
- Lanes
- 6
- Daily Traffic
- 72,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.