BW 8 over SPENCER HWY

3.2 MI S OF SH 225 · County 201, Texas · Built 2020 · 8 Lanes · 49,665 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
121020325603498
Year Built
2020
Length
80.8 m (265.1 ft)
Max Span
35.1 m
Width
45.9 m (150.6 ft)
Lanes
8
Daily Traffic
49,665
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.