BW 8 SB FR over ARMAND RELIEF

3.6 MI S OF SH 225 · County 201, Texas · Built 1970 · 3 Lanes · 11,223 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
121020325603032
Year Built
1970
Length
21.9 m (71.9 ft)
Max Span
21.6 m
Width
12.7 m (41.7 ft)
Lanes
3
Daily Traffic
11,223
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.