BW 8 EB/IH 45 NB over BW 8 & IH 45

IH 45 & BW 8 INTERCHANGE · County 201, Texas · Built 1997 · 2 Lanes · 13,124 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
121020011006291
Year Built
1997
Length
2100.7 m (6892.1 ft)
Max Span
87.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
13,124
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.