IH 45 NB OFF-RAMP over BW 8 EBFR & WBFR

IH 45 & BW 8 INTERCHANGE · County 201, Texas · Built 1995 · 1 Lanes · 19,835 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
121020011006283
Year Built
1995
Length
171.3 m (562 ft)
Max Span
25.3 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
19,835
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.