BW 8 SB over US 90

AT INT US 90 & BW 8 · County 201, Texas · Built 2010 · 3 Lanes · 20,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
121020002802507
Year Built
2010
Length
904.6 m (2967.8 ft)
Max Span
36.6 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
20,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.