US 90 over UVALDE RD
0.40 MI SW OF BW 8 · County 201, Texas · Built 1990 · 6 Lanes · 28,348 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
29.83755, -95.181853
This bridge is in worse condition than 93.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
BW 8 SB FR over DRAINAGE DITCH
Built 1989
BW 8 SB over US 90
Built 2010
BW 8 over BUS US 90 & UP RR
Built 2011
BW 8 NB FR over BUS 90 & UP RR
Built 1989
BW 8 SB FR over BUS 90 & UP RR
Built 1989
US 90 WB over BW 8 FRTG RDS
Built 1990
US 90 EB over BW 8 FRTG RDS
Built 1990
US 90 over DRAINAGE DITCH
Built 1989
BW 8 SB FR over DRAINAGE DITCH
Built 1989
US 90 WB FR over HCFCD DITCH P107-00-00
Built 2010
Bridge Details
- Structure #
- 121020002802208
- Year Built
- 1990
- Length
- 105.2 m (345.1 ft)
- Max Span
- 35.1 m
- Width
- 36.2 m (118.8 ft)
- Lanes
- 6
- Daily Traffic
- 28,348
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.