Cane Island Parkwy over IH 10

1 MI W of FM 1463 · County 157, Texas · Built 2016 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
120800027105711
Year Built
2016
Length
131.7 m (432.1 ft)
Max Span
32.9 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.