IH 10 WB Exit Ramp over SNAKE CREEK
0.3 MI W OF FM 1463 · County 157, Texas · Built 2018 · 1 Lanes · 7,200 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.777569, -95.838064
This bridge is in worse condition than 28.2% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
IH 10 EB FRTG RD over SNAKE CREEK
Built 1967
US 90 over SNAKE CREEK
Built 1992
IH 10 ML over SNAKE CREEK
Built 1967
IH 10 WB FRTG RD over SNAKE CREEK
Built 1967
FM 1463 over BUFFALO BAYOU
Built 1972
IH 10 over FM 1463
Built 1967
IH 10 EBML over CANE BR BUFFALO BAYOU
Built 1967
IH 10 EBFR over CANE BR BUFFALO BAYOU
Built 1967
IH 10 WBML over CANE BR BUFFALO BAYOU
Built 1967
Kingsland Blvd over Drainage Ditch
Built 2005
Bridge Details
- Structure #
- 120800027105713
- Year Built
- 2018
- Length
- 24.4 m (80.1 ft)
- Max Span
- 24.4 m
- Width
- 8 m (26.2 ft)
- Lanes
- 1
- Daily Traffic
- 7,200
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.