US 90A EB over BRAZOS RIVER
0.60 MI NE OF FM 762 · County 157, Texas · Built 1989 · 2 Lanes · 15,740 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
29.583053, -95.757389
This bridge is in worse condition than 81.2% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 37 years old.
Nearby Bridges
US 90A WB over BRAZOS RIVER
Built 1965
HILLCREST DR over RABBS BAYOU
Built 2016
EDGEWOOD RD over DRAINAGE DITCH
Built 2010
GOLFVIEW DR over RABBS BAYOU
Built 1997
US 90A over GEORGES SLOUGH
Built 1993
US 90A over NATURAL GROUND
Built 2019
Riverwood Dr over Irrigation Canal
Built 1990
FM 359 over UP RR AND US 90A WB
Built 2019
DEL WEBB BLVD over RABBS BAYOU
Built 2014
SWEETGRASS CIRCLE over DEL WEBB WET POND
Built 2014
Bridge Details
- Structure #
- 120800002708436
- Year Built
- 1989
- Length
- 331.3 m (1086.9 ft)
- Max Span
- 71.9 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 15,740
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.