US 90A WB over BRAZOS RIVER
0.60 MI NE OF FM 762 · County 157, Texas · Built 1965 · 2 Lanes · 17,960 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
29.583775, -95.758
This bridge is in worse condition than 96.8% of bridges in County 157. The average bridge in Texas is 0 years old; this one is 61 years old.
Nearby Bridges
US 90A EB over BRAZOS RIVER
Built 1989
HILLCREST DR over RABBS BAYOU
Built 2016
EDGEWOOD RD over DRAINAGE DITCH
Built 2010
GOLFVIEW DR over RABBS BAYOU
Built 1997
US 90A over GEORGES SLOUGH
Built 1993
Riverwood Dr over Irrigation Canal
Built 1990
US 90A over NATURAL GROUND
Built 2019
FM 359 over UP RR AND US 90A WB
Built 2019
DEL WEBB BLVD over RABBS BAYOU
Built 2014
SWEETGRASS CIRCLE over DEL WEBB WET POND
Built 2014
Bridge Details
- Structure #
- 120800002708092
- Year Built
- 1965
- Length
- 287.1 m (941.9 ft)
- Max Span
- 54.9 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 17,960
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $51,000
- Total Project Cost
- $64,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.