ROBINSON DR over HICKORY SLOUGH
0.10 MI N OF KNAPP RD · County 039, Texas · Built 2011 · 2 Lanes · 400 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.592556, -95.272908
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 15 years old.
Nearby Bridges
OLD ALVIN RD over HICKORY SLOUGH
Built 2012
PEARLAND PKWY SB over CLEAR CREEK
Built 2007
PEARLAND PKWY NB over CLEAR CREEK
Built 2007
BW 8 EBFR over HCFCD DITCH A-125-00-00
Built 1993
BW 8 ML over HCFCD DITCH A-125-00-00
Built 1997
BW 8 WBFR over HCFCD DITCH A-125-00-00
Built 1993
BW 8 ML & FR over HCFCD DITCH
Built 1996
BW 8 ML over MONROE RD PEARLAND PKWY
Built 1997
HALL RD over WEST CANAL
Built 1982
SH 35 over CLEAR CREEK
Built 2012
Bridge Details
- Structure #
- 120200M02095001
- Year Built
- 2011
- Length
- 21.6 m (70.9 ft)
- Max Span
- 8.2 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,000
- Total Project Cost
- $9,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.