PEARLAND PKWY SB over CLEAR CREEK
0.4 MI S OF BELTWAY 8 · County 039, Texas · Built 2007 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.594681, -95.266222
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 19 years old.
Nearby Bridges
PEARLAND PKWY NB over CLEAR CREEK
Built 2007
BW 8 ML & FR over HCFCD DITCH
Built 1996
BW 8 ML over MONROE RD PEARLAND PKWY
Built 1997
ROBINSON DR over HICKORY SLOUGH
Built 2011
OLD ALVIN RD over HICKORY SLOUGH
Built 2012
BW 8 EBFR over HCFCD DITCH A-125-00-00
Built 1993
BW 8 ML over HCFCD DITCH A-125-00-00
Built 1997
BW 8 WBFR over HCFCD DITCH A-125-00-00
Built 1993
HALL RD over WEST CANAL
Built 1982
PEARLAND PKWY over DRAINAGE DITCH
Built 2007
Bridge Details
- Structure #
- 120200M01907004
- Year Built
- 2007
- Length
- 213.4 m (700.1 ft)
- Max Span
- 30.5 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $35,000
- Total Project Cost
- $44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.