PEARLAND PKWY SB over CLEAR CREEK

0.4 MI S OF BELTWAY 8 · County 039, Texas · Built 2007 · 2 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
120200M01907004
Year Built
2007
Length
213.4 m (700.1 ft)
Max Span
30.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$35,000
Total Project Cost
$44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.