CURRY ST (CR 736) over MUSTANG BAYOU
0.15 MI S OF BAHLER RD · County 039, Texas · Built 2019 · 2 Lanes · 146 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.516733, -95.361772
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
CR 90 (Del Bello) over Mustang Bayou
Built 2022
Spears Rd (CR 872) over Mustang Bayou
Built 2017
OLD CHOC BYU RD over BRAZOS RIV AUTH CANAL
Built 2010
PATTERSON RD over MUSTANG BAYOU
Built 1981
CR 90 over S FORK MARYS CREEK
Built 2001
RIVERS RD (CR 905) over S FORK MARYS CREEK
Built 2011
FURNANCE RD over MUSTANG BAYOU
Built 2012
CR 89 over SOUTH FORK MARYS CREEK
Built 2004
SH 288 NB over CR 58
Built 2007
SH 288 SB over CR 58
Built 2007
Bridge Details
- Structure #
- 120200AA2026008
- Year Built
- 2019
- Length
- 22.9 m (75.1 ft)
- Max Span
- 7.6 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 146
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.