CR 67 over W FORK CHOCOLATE BAYOU
0.60 MI S OF CR 64 · County 039, Texas · Built 2007 · 2 Lanes · 530 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.415217, -95.394072
This bridge is in worse condition than 28.3% of bridges in County 039. The average bridge in Texas is 0 years old; this one is 19 years old.
Nearby Bridges
CR 64 over W FORK CHOC BYU
Built 2007
CR 67 over DRAINAGE DITCH
Built 2012
CR 65 over DRAINAGE DITCH
Built 2004
CR 64 over Drainage Ditch
Built 2023
CR 451A over DRAINAGE DITCH
Built 1980
CR 65 over NORTH HAYES CREEK
Built 2007
CR 62 over N HAYES CREEK
Built 1996
CR 121 over DRAW
Built 2011
CR 63 over N FORK HAYES CREEK
Built 2008
MERIDIANA PKWY WB over W FORK CHOCOLATE BAYOU
Built 2021
Bridge Details
- Structure #
- 120200AA2000001
- Year Built
- 2007
- Length
- 36.6 m (120.1 ft)
- Max Span
- 12.2 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 530
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.