PUCKETT CUTOFF over LIME BRANCH CREEK
1.45 MI E OF FM 2500 · County 373, Texas · Built 1998 · 1 Lanes · 35 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
30.783258, -94.722622
This bridge is in worse condition than 53.3% of bridges in County 373. The average bridge in Texas is 0 years old; this one is 28 years old.
Nearby Bridges
FM 942 over HICKMAN CREEK
Built 1991
FM 942 over BIG SANDY CREEK
Built 1991
EAST CLAMON CO RD over BEAR CREEK
Built 2017
UPPER LEGGETT RD over HICKMAN CREEK
Built 2013
UPPER LEGGETT RD over LIME BRANCH CREEK
Built 2013
UPPER LEGGETT RD over TRIB OF BIG SANDY CREEK
Built 2017
MIDWAY LOOP WEST over DRAW
Built 1990
US 190 over BEAR CREEK
Built 1947
US 190 over BIG SANDY CREEK
Built 1996
US 190 over BEAR & MILL CREEK RELIEF
Built 1947
Bridge Details
- Structure #
- 111870AA0310001
- Year Built
- 1998
- Length
- 12.2 m (40 ft)
- Max Span
- 4.9 m
- Width
- 4.2 m (13.8 ft)
- Lanes
- 1
- Daily Traffic
- 35
- Material
- Steel Continuous
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.