UPPER LEGGETT RD over HICKMAN CREEK
0.8 MI W OF FM 942 · County 373, Texas · Built 2013 · 2 Lanes · 39 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
30.826275, -94.737717
This bridge is in worse condition than 18.4% of bridges in County 373. The average bridge in Texas is 0 years old; this one is 13 years old.
Nearby Bridges
UPPER LEGGETT RD over LIME BRANCH CREEK
Built 2013
FM 942 over HICKMAN CREEK
Built 1991
UPPER LEGGETT RD over TRIB OF BIG SANDY CREEK
Built 2017
EAST CLAMON CO RD over BEAR CREEK
Built 2017
PUCKETT CUTOFF over LIME BRANCH CREEK
Built 1998
FM 942 over BIG SANDY CREEK
Built 1991
UPPER LEGGETT RD over BIG SANDY CREEK
Built 2001
HERB ROAD over DABBS CREEK
Built 2008
FM 942 over DABBS CREEK
Built 1956
FM 942 over DRAW
Built 1985
Bridge Details
- Structure #
- 111870AA0247001
- Year Built
- 2013
- Length
- 18.9 m (62 ft)
- Max Span
- 18.3 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 39
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.