CONCORD ROAD over LUCKY BRANCH
1.80 MI NE OF US 84 · County 309, Texas · Built 1995 · 2 Lanes · 2,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.6232, -97.073992
This bridge is in worse condition than 39.1% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 31 years old.
Nearby Bridges
MEYERS LANE over LUCKY BRANCH
Built 1950
AVIATION PARKWAY over DRAINAGE DITCH
Built 1991
AVIATION PARKWAY over DRAINAGE DITCH
Built 1991
MAEHR ROAD over TEHUACANA CREEK TRIB
Built 2016
IH 35 NB over Craven Ave
Built 2003
IH 35 SB over Craven Ave
Built 2003
US 84 WB over Tehuacana Creek Relief
Built 2003
IH 35 NB over FM 2417
Built 2003
IH 35 SB over FM 2417
Built 2003
IH 35 SB over Meyers Lane
Built 1972
Bridge Details
- Structure #
- 091610C00128001
- Year Built
- 1995
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 7.2 m (23.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,400
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.