IH 35 SB over Meyers Lane

0.7 Mi N of LP 340 N · County 309, Texas · Built 1972 · 3 Lanes · 47,401 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
091610001501324
Year Built
1972
Length
56.4 m (185 ft)
Max Span
25.9 m
Width
17 m (55.8 ft)
Lanes
3
Daily Traffic
47,401
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$700,000
Total Project Cost
$1,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.