COMPTON SCHOOL RD over HOG CREEK

2.8 MI SW OF SH 6 · County 309, Texas · Built 2020 · 2 Lanes · 165 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
091610AA0683001
Year Built
2020
Length
45.7 m (149.9 ft)
Max Span
15.2 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
165
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.