FM 185 over Middle Bosque River

1.8 Mi E of SH 317 · County 309, Texas · Built 1957 · 2 Lanes · 2,470 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
091610196901002
Year Built
1957
Length
107.6 m (353 ft)
Max Span
27.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
2,470
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,400,000
Total Project Cost
$2,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.