LP 396 EB over Union Pacific Railroad

0.8 Mi E of US 84 · County 309, Texas · Built 1963 · 4 Lanes · 7,643 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
091610025810078
Year Built
1963
Reconstructed
1987
Length
92.4 m (303.1 ft)
Max Span
12.8 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
7,643
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,100,000
Total Project Cost
$1,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.