LP 396 EB over Union Pacific Railroad
0.8 Mi E of US 84 · County 309, Texas · Built 1963 · 4 Lanes · 7,643 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.582103, -97.107953
This bridge is in worse condition than 39.1% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
SP 299 over Bellmead Ditch
Built 1932
IH 35 SB OFF RAMP over IH 35 SB ON RAMP
Built 2021
IH 35 NBML over US 84
Built 2022
IH 35 SBML over US 84
Built 2021
IH 35 over BELLMEAD DITCH
Built 2021
IH 35 SBML over BUS 77
Built 2021
IH 35 NBML over BUS 77
Built 2022
SH 6 NB over LP 340
Built 1969
US 77 BUS over Bellmead Ditch
Built 1931
SH 6 SB/SL 340 NB over UPRR
Built 1984
Bridge Details
- Structure #
- 091610025810078
- Year Built
- 1963
- Reconstructed
- 1987
- Length
- 92.4 m (303.1 ft)
- Max Span
- 12.8 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 4
- Daily Traffic
- 7,643
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,100,000
- Total Project Cost
- $1,700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.