SP 299 over Bellmead Ditch

0.40 Mi NE of IH 35 · County 309, Texas · Built 1932 · 5 Lanes · 3,527 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
091610016201001
Year Built
1932
Reconstructed
1955
Length
7.6 m (24.9 ft)
Max Span
0.9 m
Width
21.3 m (69.9 ft)
Lanes
5
Daily Traffic
3,527
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.