IH 35 over South Fork Cow Bayou Trb

1.4 Mi. N. of FM 107 · County 309, Texas · Built 2019 · 12 Lanes · 72,959 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
091610001502574
Year Built
2019
Length
9.4 m (30.8 ft)
Max Span
2.1 m
Lanes
12
Daily Traffic
72,959
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.