IH 35 SB over Union Pacific RR
0.2 Mi N of LP 340 N · County 309, Texas · Built 1972 · 3 Lanes · 47,401 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
31.320392, -97.235547
This bridge is in worse condition than 66% of bridges in County 309. The average bridge in Texas is 0 years old; this one is 54 years old.
Nearby Bridges
IH 35 SBML over Union Pacific RR
Built 2019
IH 35 SBFR over Union Pacific RR
Built 2019
IH 35 NBML over Union Pacific RR
Built 2019
IH 35 NB over Union Pacific Railroad
Built 1972
IH 35 NBFR over Union Paific RR
Built 2019
BRUCEVILLE LANE over BRANCH SOUTH COW BAYOU
Built 2007
IH 35 over South Fork Cow Bayou Trb
Built 2019
IH 35 NBML over North Eddy Drive
Built 2018
IH 35 SBML over North Eddy Drive
Built 2018
IH 35 NBML over South Fork Cow Bayou
Built 2015
Bridge Details
- Structure #
- 091610001501320
- Year Built
- 1972
- Length
- 64 m (210 ft)
- Max Span
- 18.3 m
- Width
- 26.6 m (87.3 ft)
- Lanes
- 3
- Daily Traffic
- 47,401
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $800,000
- Total Project Cost
- $1,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.