CR 208 over PIN OAK CREEK
0.70 MI SE OF NAVARRO C/L · County 293, Texas · Built 2018 · 2 Lanes · 55 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.806264, -96.692572
This bridge is in worse condition than 26.5% of bridges in County 293. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
CR 208 over PIN OAK CREEK
Built 1990
SH 171 over MUNGER BRANCH
Built 1958
CR 182 over MUNGER BRANCH
Built 2009
CR SW 4120 over PIN OAK CREEK TRIB
Built 1991
SH 171 over PIN OAK CRK
Built 1938
SH 171 over LONG BRANCH
Built 1958
CR 208 over DANIEL BRANCH
Built 1994
CR SW 4110 over Pin Oak Creek Tributary
Built 1989
CR 182 over MUNGER BRANCH TRIBUTARY
Built 2017
FM 1838 over ALLIGATOR CREEK
Built 1963
Bridge Details
- Structure #
- 091470AA0208002
- Year Built
- 2018
- Length
- 27.4 m (89.9 ft)
- Max Span
- 10.7 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 55
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.