CR 182 over MUNGER BRANCH
0.35 MI S OF SH 171 · County 293, Texas · Built 2009 · 2 Lanes · 55 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.791417, -96.704406
This bridge is in worse condition than 48% of bridges in County 293. The average bridge in Texas is 0 years old; this one is 17 years old.
Nearby Bridges
SH 171 over MUNGER BRANCH
Built 1958
SH 171 over PIN OAK CRK
Built 1938
CR 208 over PIN OAK CREEK
Built 2018
CR 182 over MUNGER BRANCH TRIBUTARY
Built 2017
CR 208 over PIN OAK CREEK
Built 1990
SH 171 over LONG BRANCH
Built 1958
CR 208 over DANIEL BRANCH
Built 1994
CR SW 4120 over PIN OAK CREEK TRIB
Built 1991
CR 181 over MUNGER BRANCH TRIBUTARY
Built 2011
CR SW 4110 over Pin Oak Creek Tributary
Built 1989
Bridge Details
- Structure #
- 091470AA0178002
- Year Built
- 2009
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 7.2 m (23.6 ft)
- Lanes
- 2
- Daily Traffic
- 55
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.