CR 211 over MUNGER BRANCH
0.85 MI NW OF FM 73 END · County 293, Texas · Built 2002 · 1 Lanes · 48 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.7995, -96.634125
This bridge is in worse condition than 48% of bridges in County 293. The average bridge in Texas is 0 years old; this one is 24 years old.
Nearby Bridges
CR 211 over PIN OAK CREEK
Built 1992
FM 1838 over ALLIGATOR CREEK
Built 1963
CR 208 over DANIEL BRANCH
Built 1994
FM 1838 over PIN OAK CREEK
Built 1963
CR 214 over ELM CREEK TRIBUTARY
Built 2010
SH 171 over LONG BRANCH
Built 1958
CR 208 over PIN OAK CREEK
Built 2018
FM 638 over PIN OAK RELIEF
Built 2012
FM 638 over PIN OAK SLOUGH
Built 2011
CR SW 4120 over PIN OAK CREEK TRIB
Built 1991
Bridge Details
- Structure #
- 091470AA0183001
- Year Built
- 2002
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.6 m
- Width
- 6.1 m (20 ft)
- Lanes
- 1
- Daily Traffic
- 48
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $334,000
- Total Project Cost
- $419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.