CR 323 over POND CREEK TRIBUTARY
0.40 MI SW OF FM 413 · County 145, Texas · Built 2010 · 2 Lanes · 42 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
31.070656, -96.949025
This bridge is in worse condition than 65.8% of bridges in County 145. The average bridge in Texas is 0 years old; this one is 16 years old.
Nearby Bridges
FM 413 over BIG BRIARY CREEK
Built 1958
EAST ROWENA AVEUNE over DRAINAGE DITCH
Built 2019
CR 322 over DRAW
Built 2000
CR 360 over SALT CREEK
Built 2022
FM 413 over TRIB OF POND CREEK
Built 1958
US 77 over SALT CREEK
Built 1951
CR 325 over DRAW
Built 2003
LP 265 over SALT CREEK
Built 2010
FM 1963 over SALT CREEK
Built 1964
US 77 over POND CREEK
Built 1951
Bridge Details
- Structure #
- 090740AA0604001
- Year Built
- 2010
- Length
- 8.2 m (26.9 ft)
- Max Span
- 1.8 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 42
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.