CR 360 over SALT CREEK
0.14 MI SE OF US 77 · County 145, Texas · Built 2022 · 2 Lanes · 220 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.080111, -96.979514
This bridge is in worse condition than 38.7% of bridges in County 145. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 77 over SALT CREEK
Built 1951
EAST ROWENA AVEUNE over DRAINAGE DITCH
Built 2019
FM 1963 over SALT CREEK
Built 1964
CR 343 over COTTONWOOD CREEK
Built 2015
SH 53 over COTTONWOOD CREEK
Built 1981
LP 265 over SALT CREEK
Built 2010
FM 1963 over COTTONWOOD CREEK
Built 1984
SH 53 over POND CREEK
Built 2018
FM 1963 over POND CREEK RELIEF
Built 2017
FM 1963 over POND CREEK
Built 1964
Bridge Details
- Structure #
- 090740AA0360001
- Year Built
- 2022
- Length
- 19.8 m (65 ft)
- Max Span
- 19.8 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 220
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.