US 77 over BRANCH OF COW BAYOU

1.55 MI N OF SH 7 · County 145, Texas · Built 1958 · 2 Lanes · 6,458 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
090740020902060
Year Built
1958
Reconstructed
1989
Length
109.7 m (359.9 ft)
Max Span
12.2 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
6,458
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,400,000
Total Project Cost
$2,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.