US 77 over BRANCH OF COW BAYOU

2.75 MI N OF SH 7 · County 145, Texas · Built 1958 · 2 Lanes · 6,417 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
090740020902058
Year Built
1958
Length
7.3 m (24 ft)
Max Span
3 m
Lanes
2
Daily Traffic
6,417
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$200,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.