US 190 EB over CLARKE RD
5.9 MI E OF LAMPASAS C/L · County 099, Texas · Built 1975 · 3 Lanes · 18,170 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.108939, -97.747594
This bridge is in worse condition than 47.5% of bridges in County 099. The average bridge in Texas is 0 years old; this one is 51 years old.
Nearby Bridges
US 190 EB over SH 195
Built 1976
US 190 WB over SH 195
Built 1976
US 190 WB over CLARKE RD
Built 1975
JASPER RD over US 190
Built 1976
DIMPLE STREET over SOUTH NOLAN CREEK
Built 1961
SH 195 over SOUTH NOLAN CREEK
Built 1960
BU 190 over LONG BRANCH CREEK
Built 1942
WILLOW SPRINGS RD over US 290
Built 2016
SOUTH 2ND STREET over SOUTH NOLAN CREEK
Built 1961
IH 14/US 190 over SOUTH NOLAN CREEK BRANCH
Built 1976
Bridge Details
- Structure #
- 090500023102059
- Year Built
- 1975
- Reconstructed
- 2006
- Length
- 62.5 m (205.1 ft)
- Max Span
- 29 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 3
- Daily Traffic
- 18,170
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $800,000
- Total Project Cost
- $1,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.