US 190 EB over SH 195

3.60 MI E OF CORYELL C/L · County 027, Texas · Built 1976 · 3 Lanes · 31,572 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
090140023103093
Year Built
1976
Reconstructed
2015
Length
82.3 m (270 ft)
Max Span
27.4 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
31,572
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.