SH 36 EB over LP 363
2.10 MI NW OF IH 35 · County 027, Texas · Built 2015 · 4 Lanes · 11,357 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.117436, -97.3858
This bridge is in worse condition than 40.1% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
SH 36 WB over LP 363
Built 2015
FM 2305 over SH 36 (LP 363)
Built 1976
FM 2305 over PEPPER CREEK BRANCH
Built 1957
SH 36 over East Pepper Creek
Built 1997
SH 36 (LP 363) over Pepper Creek Branch
Built 1976
FM 2305 over PEPPER CREEK
Built 1997
SUNFLOWER LANE over PEPPER CREEK TRIBUTARY
Built 1991
SH 36 over WEST PEPPER CREEK
Built 1997
FM 2305 over Bird Creek
Built 1957
WILDFLOWER LANE over PEPPER CREEK TRIBUTARY
Built 1993
Bridge Details
- Structure #
- 090140018403445
- Year Built
- 2015
- Length
- 89 m (292 ft)
- Max Span
- 32.3 m
- Width
- 22.9 m (75.1 ft)
- Lanes
- 4
- Daily Traffic
- 11,357
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.