SH 36 over East Pepper Creek
0.89 MI NW OF SL 363 · County 027, Texas · Built 1997 · 5 Lanes · 24,232 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
31.126944, -97.396483
This bridge is in worse condition than 40.1% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 29 years old.
Nearby Bridges
SH 36 over WEST PEPPER CREEK
Built 1997
SH 36 WB over LP 363
Built 2015
SH 36 EB over LP 363
Built 2015
FM 2305 over PEPPER CREEK
Built 1997
FM 2305 over PEPPER CREEK BRANCH
Built 1997
FM 2305 over SH 36 (LP 363)
Built 1976
SUNFLOWER LANE over PEPPER CREEK TRIBUTARY
Built 1991
FM 2305 over PEPPER CREEK BRANCH
Built 1997
SH 36 (LP 363) over Pepper Creek Branch
Built 1976
FM 2305 over PEPPER CREEK BRANCH
Built 1957
Bridge Details
- Structure #
- 090140018403047
- Year Built
- 1997
- Length
- 27.7 m (90.9 ft)
- Max Span
- 3 m
- Width
- 26.2 m (86 ft)
- Lanes
- 5
- Daily Traffic
- 24,232
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.