NUGENT AVE over IH 35
0.8 MI. N. of FM 2305 · County 027, Texas · Built 2018 · 3 Lanes · 5,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.1143, -97.355214
This bridge is in worse condition than 40.1% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
NUGENT AVE EB over IH 35
Built 2018
IH 35 over Bird Creek Branch
Built 2016
IH 35 NBFR over BNSF RR BELCO YARD
Built 2019
IH 35 NBML over BNSF BELCO YARD
Built 2019
IH 35 SBML over BELCO YARD
Built 2018
IH 35 SBFR over BELCO YARD
Built 2018
SH 53 over Bird Creek
Built 1935
ADAMS AVE over IH 35
Built 2018
CENTRAL AVE over IH 35
Built 2018
FM 2305 over Bird Creek
Built 1957
Bridge Details
- Structure #
- 090140001514701
- Year Built
- 2018
- Length
- 58.8 m (192.9 ft)
- Max Span
- 31.1 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 3
- Daily Traffic
- 5,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.