CENTRAL AVE over IH 35

IH 35 AT CENTRAL AVE · County 027, Texas · Built 2018 · 5 Lanes · 12,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

31.102075, -97.360078

This bridge is in worse condition than 40.1% of bridges in County 027. The average bridge in Texas is 0 years old; this one is 8 years old.

Nearby Bridges

Bridge Details

Structure #
090140001514699
Year Built
2018
Length
59 m (193.6 ft)
Max Span
30.8 m
Width
29.4 m (96.5 ft)
Lanes
5
Daily Traffic
12,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.