US 67 NBML over Tractor Trail
0.75 mi. S. of US 277 · County 451, Texas · Built 2022 · 3 Lanes · 16,800 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
31.494258, -100.375922
This bridge is in worse condition than 52.1% of bridges in County 451. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 67 over DRAINAGE DITCH
Built 1958
US 67 SBML over Tractor Trail
Built 2022
US 67 over DRAW
Built 1958
US 277 over DRAW
Built 1958
US 67 over DRAW
Built 1958
US 67 SBML over Paulann Blvd
Built 2022
US 67 NBML over Paulann Blvd
Built 2022
US 67 NB over US 277
Built 2014
US 67 SB over US 277
Built 2015
US 67 SB over Ramp G
Built 2022
Bridge Details
- Structure #
- 072260015802088
- Year Built
- 2022
- Length
- 79.2 m (259.8 ft)
- Max Span
- 29 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 3
- Daily Traffic
- 16,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.