US 67 SB over Ramp G
0.3 mi south of Paulann · County 451, Texas · Built 2022 · 1 Lanes · 16,800 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
31.483328, -100.384894
This bridge is in worse condition than 51.4% of bridges in County 451. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
LP 306 NB FR over DRAINAGE DITCH
Built 1990
US 67 over DRAINAGE DITCH
Built 1991
US 67 SB FR over DRAW
Built 1987
US 67 NB over LP 306 NB TO US 67 SB
Built 1990
US67SB TO LP306SB over US 67 NB TO LP 306 SB
Built 1990
US 67 NBML over Paulann Blvd
Built 2022
US67SB TO LP306 SB over US 67
Built 1990
US 67 SB over LP 306 NB TO US 67 SB
Built 1990
US 67 SBML over Paulann Blvd
Built 2022
BUS 67-J over Loop 306
Built 2007
Bridge Details
- Structure #
- 072260015802087
- Year Built
- 2022
- Length
- 157.3 m (516.1 ft)
- Max Span
- 31.7 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 1
- Daily Traffic
- 16,800
- Material
- Prestressed Concrete
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.