US 67 NB over LP 306 NB TO US 67 SB
AT INT LOOP 306 US 67 · County 451, Texas · Built 1990 · 2 Lanes · 6,048 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.479631, -100.387864
This bridge is in worse condition than 52.1% of bridges in County 451. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
US67SB TO LP306SB over US 67 NB TO LP 306 SB
Built 1990
US 67 SB over LP 306 NB TO US 67 SB
Built 1990
US 67 over DRAINAGE DITCH
Built 1991
US 67 SB FR over DRAW
Built 1987
LP 306 NB FR over DRAINAGE DITCH
Built 1990
US67SB TO LP306 SB over US 67
Built 1990
US 67 SB over Ramp G
Built 2022
BUS 67-J over Loop 306
Built 2007
BUS 67-J over DRAW
Built 1958
US 67 SB over SMITH BLVD.
Built 2000
Bridge Details
- Structure #
- 072260015802074
- Year Built
- 1990
- Length
- 45.7 m (149.9 ft)
- Max Span
- 21.3 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 6,048
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.