US 67 SB over CHADBOURNE ST

0.35 MI NE OF US 87 · County 451, Texas · Built 1999 · 3 Lanes · 15,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
072260015802056
Year Built
1999
Length
57.3 m (188 ft)
Max Span
27.4 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
15,650
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.