US 67 NB FR over N CONCHO RIVER

0.05 MI SW OF US 87 · County 451, Texas · Built 1936 · 3 Lanes · 7,827 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
072260007706072
Year Built
1936
Length
119.5 m (392.1 ft)
Max Span
17.1 m
Width
15.2 m (49.9 ft)
Lanes
3
Daily Traffic
7,827
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$30,000
Total Project Cost
$38,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.