Park Vista Blvd over Trib Big Bear Creek
0.2 MI N OF GOLD TRIANGLE · County 439, Texas · Built 2018 · 4 Lanes · 10,988 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.934208, -97.271981
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
GOLDEN TRIANGLE over TRIB. TO BIG BEAR CREEK
Built 2013
KENNY DR over TRIB TO BIG BEAR CREEK
Built 2004
GOLDEN TRIANGLE over TRIB OF BIG BEAR CREEK
Built 2013
Park Vista Blvd over Drainage Ditch
Built 2018
FM 1709 over TRIB GRAPEVINE LAKE
Built 1994
GOLDEN TRIANGLE EB over BIG BEAR CREEK
Built 2013
GOLDEN TRIANGLE WB over BIG BEAR CREEK
Built 2013
ALTA VISTA RD over BIG BEAR CREEK TRIBUTARY
Built 2013
WOODLAND SPRINGS D over TRIB OF BIG BEAR CREEK
Built 2000
GOLDEN TRIANGLE BV over TRIB. TO BIG BEAR CREEK
Built 2009
Bridge Details
- Structure #
- 022200ZP2105003
- Year Built
- 2018
- Length
- 13.1 m (43 ft)
- Max Span
- 3 m
- Width
- 33.8 m (110.9 ft)
- Lanes
- 4
- Daily Traffic
- 10,988
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.