GOLDEN TRIANGLE EB over BIG BEAR CREEK
2.2 MI. E. OF IH-35W · County 439, Texas · Built 2013 · 2 Lanes · 13,819 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.931494, -97.279861
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 13 years old.
Nearby Bridges
GOLDEN TRIANGLE WB over BIG BEAR CREEK
Built 2013
FM 1709 over TRIB GRAPEVINE LAKE
Built 1994
KENNY DR over TRIB TO BIG BEAR CREEK
Built 2004
Park Vista Blvd over Drainage Ditch
Built 2018
Park Vista Blvd over Trib Big Bear Creek
Built 2018
N BEACH ST over BIG BEAR CREEK TRIBUTARY
Built 2012
N BEACH ST over BIG BEAR CREEK TRIBUTARY
Built 2012
ALTA VISTA RD over BIG BEAR CREEK TRIBUTARY
Built 2013
GOLDEN TRIANGLE over TRIB. TO BIG BEAR CREEK
Built 2013
RANCHO PLACE over BIG BEAR CREEK TRIBUTARY
Built 2000
Bridge Details
- Structure #
- 022200ZG4970003
- Year Built
- 2013
- Length
- 31.1 m (102 ft)
- Max Span
- 10.1 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,819
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.