BALLPARK WAY over JOHNSON CREEK

0.1 MI S OF CONVENTION DR · County 439, Texas · Built 1984 · 7 Lanes · 17,314 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
022200C05765001
Year Built
1984
Length
37.2 m (122 ft)
Max Span
12.2 m
Width
29.7 m (97.4 ft)
Lanes
7
Daily Traffic
17,314
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.